The land

Sixteen to forty hectares, judged against eight things.

Homes would occupy fifteen to twenty per cent of the site. The rest stays productive land, bushland, water catchment and fire protection — which is why the site has to be larger than the number of dwellings suggests.

No land is under contract. Lantis Grove is at feasibility stage: no property has been secured, no development application has been lodged, and no dwelling is for sale. If you have land, the foundation would like to hear about it — bringing a property forward commits you to nothing.

Bring us land

The acquisition criteria

CriterionWhat it means in practice
High ground, clear of floodA flood-free building platform, with the access road above the flood line too.
North orientationDwellings sited for passive solar gain, so heating demand stays low through winter.
WaterRoof catchment for drinking supply, plus harvestable-rights dams or a bore for the garden and firefighting reserve.
SoilGround that can carry footings, a market garden and on-site sewage management without engineered workarounds.
All-weather accessA formed road usable by a truck and a fire tanker in rain, not a track that closes in winter.
Distance to a hospital with a theatreA therapeutic community for people living with illness needs real medical backup, not a clinic an hour away.
Mobile and internet coverageCoverage that supports telehealth, remote work and staying in contact with family.
Room for asset protection zonesSpace to keep vegetation managed around dwellings at the bushfire attack level the site requires.

Where, exactly

Regional New South Wales is settled. The specific region and the maximum drive time from Sydney are still being worked through with a NSW rural town planner, and will be published here once they are decided.

Target region and drive time — to confirm